Facade works:

  • Cladding of cold passages is in progress.
  • The facade is being finished (the top layer of the hinged ventilated facade and porcelain stoneware is being installed).

Works on the lower floors:

  • The installation of window slopes and flashings is ongoing.

Roofing:

  • Decorative lighting of the facade is arranged.
  • Fencing is being installed.

Stained glass systems:

  • Installation of double-glazed windows and doors is underway.
  • Installation of stained glass systems of the stylobate is in progress.

Engineering networks:

  • Installation of low-current systems, as well as installation of external utility networks.
  • Internal engineering networks (sewerage, electricity) are installed.
  • Ventilation ducts are being waterproofed.

General house works:

  • Waterproofing of the basement part of the stylobate is in progress.
  • Railings are being installed along the staircases.
  • Screeds are being installed in cold passages.
  • Work continues on the installation of reinforced concrete communication chambers.

Sign up for a consultation

Our managers will contact you to clarify your wishes

Записатись
Sign up for a consultation
Заповніть поля для уточнення інформації нашому менеджеру
телефон має бути в форматі 0XXXXXXXXX
Poetica
2 Mechnikova Str., Kyiv Parus BС
About
Progress
Gallery
Developer
Location
News
Contacts

Client space ENSO

+38 (044) 299-50-17client@enso.ua
© Poetica 2025. All rights reserved
digital agency
FacebookIcons / Filled / InstagramCreated with Sketch.Icons / Filled / YoutubeCreated with Sketch.Icons / Filled / TelegramCreated with Sketch.