------- 1/2025

January 2025

Back

Facade works:

  • Facade decoration works are in progress (the upper layer of the hinged ventilated facade and porcelain stoneware is being installed).
  • Cold passages are being lined.

Works on the lower floors:

  • Work on installing window slopes and ebbs is being carried out.

Roofing:

  • Work on installing decorative lighting on the facade is continuing.

Stained glass systems:

  • Installation of stained glass systems of the stylobate is in progress, glazing is being carried out.

Engineering networks:

  • Installation of low-voltage systems and installation of external and internal engineering networks is continuing.

General building works:

  • Work on installing a photovoltaic system on the basement part of the stylobate, along Moldavska Street, has been completed.
  • Waterproofing of the basement part of the stylobate is being carried out.
  • Work on installing reinforced concrete communication chambers is being carried out.

Sign up for a consultation

Our managers will contact you to clarify your wishes

Записатись
Sign up for a consultation
Заповніть поля для уточнення інформації нашому менеджеру
телефон має бути в форматі 0XXXXXXXXX
Poetica
2 Mechnikova Str., Kyiv Parus BС
About
Progress
Gallery
Developer
Location
News
Contacts

Client space ENSO

+38 (044) 299-50-17client@enso.ua
© Poetica 2025. All rights reserved
digital agency
FacebookIcons / Filled / InstagramCreated with Sketch.Icons / Filled / YoutubeCreated with Sketch.Icons / Filled / TelegramCreated with Sketch.