------- 9/2024

September 2024

Back

Facade works:

  • Facade finishing works continue.
  • Installation of air conditioning baskets and lighting fixtures continues.
  • Cold passages are being lined.

Works on the lower floors:

  • Clinker bricks are being installed.
  • Installation of window slopes and ebbs is in progress.

Roofing:

  • Work is underway to install decorative lighting on the facades.

Stained glass systems:

  • Installation of stained-glass windows on the stylobate and 1-2 floors is ongoing.

Engineering networks:

  • Work continues on the installation of low-current systems.
  • Works are underway to install internal utility networks.
  • Works on the installation of external engineering networks are underway.

General house works:

  • Waterproofing of the basement part of the stylobate is being arranged.
  • The walls of the technical rooms are being masonry.

Sign up for a consultation

Our managers will contact you to clarify your wishes

Записатись
Sign up for a consultation
Заповніть поля для уточнення інформації нашому менеджеру
телефон має бути в форматі 0XXXXXXXXX
Poetica
2 Mechnikova Str., Kyiv Parus BС
About
Progress
Gallery
Developer
Location
News
Contacts

Client space ENSO

+38 (044) 299-50-17client@enso.ua
© Poetica 2025. All rights reserved
digital agency
FacebookIcons / Filled / InstagramCreated with Sketch.Icons / Filled / YoutubeCreated with Sketch.Icons / Filled / TelegramCreated with Sketch.