------- 11/2023

November 2023

Back
  • Installation works for thermal insulation on the facade and installation of aluminum profiles for the subsequent attachment of the ventilated facade are being carried out.
  • Adjustment of ceramic granite on the facade is underway.
  • Installation of window sills is in progress.
  • Works on the commissioning of Kone elevators are being carried out.
  • Continuation of installation works for low-current systems.
  • Installation of connections for glass structures is in progress.
  • Works on internal engineering networks are being carried out.
  • Installation of external sewerage networks, water supply, and rainwater drainage is in progress.

Sign up for a consultation

Our managers will contact you to clarify your wishes

Записатись
Sign up for a consultation
Заповніть поля для уточнення інформації нашому менеджеру
телефон має бути в форматі 0XXXXXXXXX
Poetica
2 Mechnikova Str., Kyiv Parus BС
About
Progress
Gallery
Developer
Location
News
Contacts

Client space ENSO

+38 (044) 299-50-17client@enso.ua
© Poetica 2025. All rights reserved
digital agency
FacebookIcons / Filled / InstagramCreated with Sketch.Icons / Filled / YoutubeCreated with Sketch.Icons / Filled / TelegramCreated with Sketch.