Installation works for thermal insulation on the facade and installation of aluminum profiles for the subsequent attachment of the ventilated facade are being carried out.
Adjustment of ceramic granite on the facade is underway.
Installation of window sills is in progress.
Works on the commissioning of Kone elevators are being carried out.
Continuation of installation works for low-current systems.
Installation of connections for glass structures is in progress.
Works on internal engineering networks are being carried out.
Installation of external sewerage networks, water supply, and rainwater drainage is in progress.